Kitchen Renovation for CHT Hillsborough Care Home

When CTH Hillsborough needed a complete kitchen overhaul to address critical issues in their aging facility, they turned to Hostservice—a trusted partner with years of experience in kitchen renovations. Hostservice ensured the project was efficient, collaborative, and tailored to meet the client’s operational needs.

Hostservice has had the privilege of partnering with CTH Hillsborough for several years, providing expertise in construction and renovation projects. Recently, we took on the task of upgrading an aging facility in need of significant improvements.

Initial Audit We conducted a comprehensive audit of the facility to assess its condition. Our findings revealed several critical issues:

  • A dated kitchen that no longer met modern standards for functionality or hygiene.
  • Substantial subsidence in the flooring, creating potential hazards for staff and residents.
  • Dangerous and outdated electrical wiring, posing a significant safety risk.
  • Non-compliant ventilation systems that did not meet regulatory requirements, compromising air quality.

These findings underscored the urgent need for a thorough renovation to ensure compliance, safety, and operational efficiency.

Design and Pricing Process Our team worked closely with the client to develop a tailored design solution that addressed each identified issue. This included:

  • Redesigning the kitchen to optimize workflow, improve hygiene, and incorporate modern equipment.
  • Reinforcing and leveling the subsiding flooring to eliminate hazards and ensure structural integrity.
  • Replacing the electrical systems with safe, compliant wiring.
  • Installing a new ventilation system that met all regulatory standards.

We provided the client with a detailed and transparent pricing package that covered all aspects of the project, including building, electrical, plumbing, flooring, and ventilation work. This ensured the client had a clear understanding of the scope, timeline, and costs involved.

Project Management Our team took full responsibility for managing the build process from start to finish, ensuring the renovation was executed efficiently and to the highest standards. Key elements of our approach included:

  • Minimizing Disruption: To keep the facility operational during the renovation, we implemented a temporary kitchen solution. This allowed staff to continue providing meals to residents without interruption.
  • Coordination Across Trades: We carefully coordinated the work of builders, electricians, plumbers, flooring specialists, and ventilation experts to maintain a seamless workflow.
  • Regular Communication: We kept the client informed at every stage, providing updates on progress, challenges, and milestones.

Outcome The project was completed on time and within budget, transforming the facility into a safe, compliant, and modern space. Key achievements included:

  • A state-of-the-art kitchen that enhanced efficiency and met all hygiene standards.
  • Secure and level flooring, ensuring the safety of residents and staff.
  • An updated electrical system that eliminated safety risks.
  • A compliant ventilation system that improved air quality and comfort throughout the facility.

By addressing these critical issues, the facility is now better equipped to provide high-quality care for its residents while ensuring a safe and efficient working environment for staff. Our holistic approach and commitment to excellence delivered a result that exceeded the client’s expectations.